Installation Instructions for NP-1263-A
Roll and Pin Assembly

 
  1. Remove Bijur Lube Line. If your machine is equipped with only and oil fitting, it will be necessary to attach the bijur system to the pickup. A number 3 restrictor in the line will be necessary to ensure proper lubrication of the rolls.

  2. Loosen both 1/4-24 Square Head Screws (837-10-6)

  3. Loosen both 3/8-16 Hex Head Bolts (835-14-24)

  4. Loosen both 3/8-16 Socket Head Set Screws (836-14-8)

  5. Loosen 1/4-24 Square Head Screws (837-10-8) [not shown]

  6. Remove Turnbuckle Pin (5080-226-50)

  7. Remove Actuating Arm Pin (1263-14)

  8. Remove Actuating Arm (1266-4)

  9. Remove Yoke (1266-4)

  10. Remove both Bronze Shoes (1263-13) and Pins (1263-12)

  11. Replace with Pins (NP-1263-12-P) and Slide on Rolls (NP-1263-13-R)

  12. Reassemble in reverse order

  13. Adjust opening and closing turnbuckles so fulcrum or wedge chuck will not over close.

  14. Cycle machine and check for proper operation of Burring Spindle